{"id":647,"date":"2025-11-12T10:01:37","date_gmt":"2025-11-12T10:01:37","guid":{"rendered":"https:\/\/growhome.vn\/?p=647"},"modified":"2025-11-14T15:37:10","modified_gmt":"2025-11-14T15:37:10","slug":"%e6%b7%b7%e5%87%9d%e5%9c%9f%e6%b5%87%e7%ad%91%e6%8a%80%e6%9c%af%e5%8f%8a%e6%b5%81%e7%a8%8b%e4%ba%a4%e5%ba%95-ban-giao-ki-thuat-quy-trinh-do-be-tong-concrete-pouring-technique-and-procedure-handove","status":"publish","type":"post","link":"https:\/\/growhome.vn\/?p=647","title":{"rendered":"\u6df7\u51dd\u571f\u6d47\u7b51\u6280\u672f\u53ca\u6d41\u7a0b\u4ea4\u5e95. B\u00c0N GIAO K\u0128 THU\u1eacT &#038; QUY TR\u00ccNH \u0110\u1ed4 B\u00ca T\u00d4NG. Concrete Pouring Technique and Procedure Handover"},"content":{"rendered":"<div class=\"fcbkbttn_buttons_block\" id=\"fcbkbttn_left\"><div class=\"fcbkbttn_button\">\n\t\t\t\t\t<a href=\"https:\/\/www.facebook.com\/\" target=\"_blank\">\n\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/growhome.vn\/wp-content\/plugins\/facebook-button-plugin\/images\/standard-facebook-ico.png\" alt=\"Fb-Button\" \/>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div><div class=\"fcbkbttn_like \"><fb:like href=\"https:\/\/growhome.vn\/?p=647\" action=\"like\" colorscheme=\"light\" layout=\"standard\"  width=\"225px\" size=\"small\"><\/fb:like><\/div><\/div>\n<p class=\"has-black-color has-text-color has-link-color has-medium-font-size wp-elements-1 wp-block-paragraph\"><strong>I. \u51c6\u5907\u9636\u6bb5<\/strong><br><strong>I. Giai \u0111o\u1ea1n chu\u1ea9n b\u1ecb<\/strong><br><strong>I. Preparation Phase<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list has-medium-font-size\">\n<li class=\"has-medium-font-size\">\u63d0\u4ea4\u5e76\u6279\u51c6\u6df7\u51dd\u571f\u4f9b\u5e94\u5546<br>. Tr\u00ecnh, ph\u00ea duy\u1ec7t nh\u00e0 cung c\u1ea5p b\u00ea t\u00f4ng<br>. Submit and approve the concrete supplier<\/li>\n\n\n\n<li>\u68c0\u67e5\u6405\u62cc\u7ad9\u3001\u751f\u4ea7\u6d41\u7a0b\uff0c\u53d6\u6837\u6750\u6599\uff0c\u8bbe\u8ba1\u6750\u6599\u914d\u5408\u6bd4<br>. Ki\u1ec3m tra tr\u1ea1m tr\u1ed9n, ki\u1ec3m tra quy tr\u00ecnh s\u1ea3n xu\u1ea5t, l\u1ea5y m\u1eabu v\u1eadt li\u1ec7u, thi\u1ebft k\u1ebf c\u1ea5p ph\u1ed1i v\u1eadt li\u1ec7u.<br>. Check the batching plant, production process, take material samples, and design the material mix ratio.<\/li>\n\n\n\n<li>\u6ce8\u610f\u4e8b\u9879\uff1a\u6df7\u51dd\u571f\u751f\u4ea7\u5e76\u4f9b\u5e94\u5230\u65bd\u5de5\u73b0\u573a\u65f6\u3002\u5982\u679c\u5728\u6df7\u51dd\u571f\u6d47\u7b51\u8fc7\u7a0b\u4e2d\uff0c\u53ef\u4ee5\u4ece2-3\u4e2a\u7ad9\u63d0\u4f9b\u6df7\u51dd\u571f\uff0c\u68c0\u67e5\u6405\u62cc\u7ad9\u65f6\uff0c\u4e5f\u5fc5\u987b\u68c0\u67e5\u8fd9\u4e9b\u7ad9\u3002\u4e0d\u80fd\u4e00\u8fb9\u68c0\u67e5\u4e00\u4e2a\u7ad9\uff0c\u4e00\u8fb9\u53c8\u4ece\u53e6\u4e00\u4e2a\u7ad9\u4f9b\u5e94\u6df7\u51dd\u571f\u3002<br>. V\u1ea5n \u0111\u1ec1 c\u1ea7n l\u01b0u \u00fd: B\u00ea t\u00f4ng s\u1ea3n xu\u1ea5t \u1edf \u0111\u00e2u, c\u1ea5p cho c\u00f4ng tr\u01b0\u1eddng \u1edf \u0111\u00e2u th\u00ec ki\u1ec3m tra tr\u1ea1m \u0111\u1ea5y, n\u1ebfu trong l\u00fac \u0111\u1ed5 b\u00ea t\u00f4ng b\u00ea t\u00f4ng c\u00f3 th\u1ec3 l\u1ea5y \u1edf 2-3 tr\u1ea1m, th\u00ec khi \u0111i ki\u1ec3m tra tr\u1ea1m tr\u1ed9n c\u0169ng ph\u1ea3i ki\u1ec3m tra c\u00e1c tr\u1ea1m \u0111\u1ea5y, kh\u00f4ng th\u1ec3 ki\u1ec3m tra m\u1ed9t tr\u1ea1m c\u00f2n c\u1ea5p b\u00ea t\u00f4ng l\u1ea1i l\u1ea5y t\u1eeb tr\u1ea1m kh\u00e1c.<br>. Note: The batching plant must be inspected where the concrete is produced and supplied to the construction site. If concrete can be supplied from 2-3 plants during the concrete pouring process, these plants must also be inspected. It is unacceptable to inspect one plant while receiving concrete from another.<\/li>\n<\/ol>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>II. \u67f1\u4f53\u6df7\u51dd\u571f\u6d47\u7b51\u6d41\u7a0b<\/strong><br><strong>II. Quy tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng c\u1ed9t<\/strong><br><strong>II. Column Concrete Pouring Procedure<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list has-medium-font-size\">\n<li>\u67f1\u4f53\u6df7\u51dd\u571f\u5206\u6279\u5206\u6bb5\u6d47\u7b51\uff0c\u5148\u6d47\u7b51\u67f1\u4f53\u6df7\u51dd\u571f\uff0c\u5206\u6210\u51e0\u6279\u6d47\u7b51\uff0c\u4ee5\u4fbf\u80fd\u591f\u5229\u7528\u6a21\u677f\u5468\u8f6c\uff0c\u8282\u7701\u6750\u6599\u6210\u672c\uff0c\u5e76\u4f5c\u4e3a\u6881\u677f\u811a\u624b\u67b6\u4f53\u7cfb\u7684\u652f\u6491\u70b9\uff0c\u786e\u4fdd\u6881\u677f\u6a21\u677f\u7684\u7a33\u5b9a\u3001\u7262\u56fa<br>. B\u00ea t\u00f4ng c\u1ed9t ph\u00e2n \u0111\u1ee3t ph\u00e2n \u0111o\u1ea1n \u0111\u1ec3 \u0111\u1ed5, \u0111\u1ed5 b\u00ea t\u00f4ng c\u1ed9t tr\u01b0\u1edbc, chia l\u00e0m c\u00e1c m\u1ebb \u0111\u1ed5 \u0111\u1ec3 c\u00f3 th\u1ec3 t\u1eadn d\u1ee5ng lu\u00e2n chuy\u1ec3n copha ti\u1ebft ki\u1ec7m chi ph\u00ed v\u1eadt li\u1ec7u, l\u00e0m \u0111i\u1ec3m t\u1ef1a \u0111\u1ec3 gi\u1eb1ng neo h\u1ec7 gi\u00e0n gi\u00e1o d\u1ea7m s\u00e0n \u0111\u1ea9m b\u1ea3o \u1ed5n \u0111\u1ecbnh, ch\u1eafc ch\u1eafn c\u1ee7a h\u1ec7 v\u00e1n khu\u00f4n d\u1ea7m s\u00e0n.<br>. Column concrete is poured in batches and sections. Column concrete is poured first, divided into several batches to allow for formwork turnover, save material costs, and serve as a bracing point for the beam-slab scaffolding system, ensuring the stability and firmness of the beam-slab formwork system.<\/li>\n\n\n\n<li>\u5236\u5b9a\u6df7\u51dd\u571f\u8ba1\u5212\u3001\u6df7\u51dd\u571f\u6cf5\u9001\u8ba1\u5212<br>. Vi\u1ebft k\u1ebf ho\u1ea1ch b\u00ea t\u00f4ng, b\u01a1m b\u00ea t\u00f4ng.<br>. Prepare the concrete plan and concrete pumping plan.<\/li>\n\n\n\n<li>\u6df7\u51dd\u571f\u5355\u4f4d\u5230\u573a\u68c0\u67e5\u6cf5\u8f66\u51fa\u811a\u4f4d\u7f6e\u3001\u7ad9\u7acb\u4f4d\u7f6e\uff0c\u51c6\u5907\u7167\u660e\u7535\u6e90\u3001\u632f\u6363\u5668\u7535\u6e90\u3001\u517b\u62a4\u7528\u6c34\u7ba1<br>. \u0110\u01a1n v\u1ecb b\u00ea t\u00f4ng \u0111\u1ebfn c\u00f4ng tr\u01b0\u1eddng ki\u1ec3m tra v\u1ecb tr\u00ed ra ch\u00e2n b\u01a1m, \u0111\u1ee9ng b\u01a1m, chu\u1ea9n b\u1ecb m\u1eb7t b\u1eb1ng, ngu\u1ed3n s\u00e1ng, ngu\u1ed3n \u0111i\u1ec7n cho m\u00e1y \u0111\u1ea7m, v\u00f2i n\u01b0\u1edbc b\u1ea3o d\u01b0\u1ee1ng.<br>. The concrete unit arrives at the site to check the pump truck&#8217;s outrigger position and standing position, prepare the site, lighting, power for the vibrator, and curing water hose.<\/li>\n\n\n\n<li>\u6df7\u51dd\u571f\u6d47\u7b51\u524d\u68c0\u67e5\u9a8c\u6536\u94a2\u7b4b\u3001\u67f1\u94a2\u7b4b\u4fdd\u62a4\u5c42\u57ab\u5757\u3001\u67f1\u6a21\u677f\uff0c\u9884\u57cb\u4ef6\uff0c\u68c0\u67e5\u6a21\u677f\u5e95\u811a\u4f4d\u7f6e\u3001\u6a21\u677f\u5782\u76f4\u5ea6\u3001\u67f1\u6a21\u677f\u7684\u7262\u56fa\u6027\u3001\u5bc6\u95ed\u6027<br>. Ki\u1ec3m tra nghi\u1ec7m thu c\u1ed1t th\u00e9p, con k\u00ea th\u00e9p c\u1ed9t, v\u00e1n khu\u00f4n c\u1ed9t tr\u01b0\u1edbc khi \u0111\u1ed5 b\u00ea t\u00f4ng, c\u00e1c chi ti\u1ebft ch\u00f4n s\u1eb5n, ki\u1ec3m tra v\u1ecb tr\u00ed ch\u00e2n c\u01a1 v\u00e1n khu\u00f4n, \u0111\u1ed9 th\u1eb3ng \u0111\u1ee9ng v\u00e1n khu\u00f4n, \u0111\u1ed9 ch\u1eafc ch\u1eafn, k\u00edn kh\u00edt v\u00e1n khu\u00f4n c\u1ed9t.<br>. Inspect and accept the reinforcement, column steel spacers (cover blocks), column formwork, embedded items before pouring concrete, check the formwork base position, formwork verticality, firmness, and tightness of the column formwork.<\/li>\n\n\n\n<li>\u51c6\u5907\u6d47\u7b51\u6df7\u51dd\u571f\uff0c\u6d47\u7b51\u524d\u68c0\u67e5\u9a8c\u6536\u5404\u9879\u51c6\u5907\u5de5\u4f5c\uff0c\u5982\u632f\u6363\u5de5\u5177\u3001\u64cd\u4f5c\u5e73\u53f0\u3001\u906e\u6321\u6df7\u51dd\u571f\u6389\u843d\u7684\u5851\u6599\u5e03\u3001\u5de5\u4eba\u3001\u7535\u6e90\u3001\u6c34\u6e90\uff0c\u8fd9\u4e9b\u5de5\u4f5c\u8981\u5199\u9a8c\u6536\u8bb0\u5f55\u5355\uff0c\u4e3e\u724c\u9a8c\u6536\u3002<br>. Chu\u1ea9n b\u1ecb \u0111\u1ed5 b\u00ea t\u00f4ng, ki\u1ec3m tra nghi\u1ec7m thu c\u00e1c c\u00f4ng t\u00e1c chu\u1ea9n b\u1ecb tr\u01b0\u1edbc khi \u0111\u1ed5 b\u00ea t\u00f4ng nh\u01b0, d\u1ee5ng c\u1ee5 \u0111\u1ea7m, s\u00e0n thao t\u00e1c, nilong che ch\u1eafn b\u00ea t\u00f4ng r\u01a1i v\u00e3i, c\u00f4ng nh\u00e2n, ngu\u1ed3n \u0111i\u1ec7n, ngu\u1ed3n n\u01b0\u1edbc \u201cch\u00fa \u00fd c\u1ea7n ch\u1ee5p \u1ea3nh gi\u01a1 b\u1ea3ng v\u00e0 l\u00e0m bi\u00ean b\u1ea3n nghi\u1ec7m thu\u201d<br>. Prepare to pour concrete, inspect and accept all preparations before pouring concrete, such as vibrating tools, working platforms, plastic sheeting to prevent concrete spillage, workers, power supply, and water supply. These tasks require a written acceptance record and sign-off (with a photo of a signboard\/checklist).<\/li>\n\n\n\n<li>\u5b89\u6392\u6405\u62cc\u7ad9\u503c\u73ed\u4eba\u5458\uff0c\u68c0\u67e5\u6405\u62cc\u7ad9\u60c5\u51b5\uff08\u68c0\u67e5\u8fdb\u6599\uff0c\u907f\u514d\u8f93\u5165\u810f\u7802\uff0c\u4ece\u5c0f\u6599\u573a\u6536\u7802\uff0c\u9020\u6210\u7802\u5b50\u6df7\u5165\u6ce5\u571f\u548c\u6742\u8d28\uff09\uff0c\u5728\u79f0\u91cd\u7ad9\u503c\u73ed\uff0c\u68c0\u67e5\u6df7\u51dd\u571f\u8fd0\u8f93\u8f66\u94c5\u5c01\u3001\u6df7\u51dd\u571f\u5c0f\u7968\uff0c\u6d47\u94f8\u5b9e\u9a8c\u6297\u538b\u8bd5\u6837\uff0c\u68c0\u67e5\u6df7\u51dd\u571f\u574d\u843d\u5ea6\u3002<br>. B\u1ed1 tr\u00ed ng\u01b0\u1eddi tr\u1ef1c tr\u1ea1m tr\u1ed9n ki\u1ec3m tra tr\u1ea1m tr\u1ed9n (ki\u1ec3m tra v\u1eadt li\u1ec7u \u0111\u1ea7u v\u00e0o, tr\u00e1nh nh\u1eadp c\u00e1t b\u1ea9n, gom c\u00e1t \u1edf c\u00e1c b\u00e3i nh\u1ecf d\u1eabn \u0111\u1ebfn c\u00e1t b\u1ecb l\u1eabn b\u00f9n, t\u1ea1p ch\u1ea5t), tr\u1ef1c tr\u1ea1m c\u00e2n, ki\u1ec3m tra k\u1eb9p ch\u00ec xe b\u00ea t\u00f4ng, phi\u1ebfu b\u00ea t\u00f4ng, \u0111\u00fac m\u1eabu n\u00e9n th\u00ed nghi\u1ec7m, ki\u1ec3m tra \u0111\u1ed9 s\u1ee5t b\u00ea t\u00f4ng.<br>. Arrange personnel to be on duty at the batching plant to check the plant conditions (check incoming materials, avoid dirty sand, collecting sand from small yards can lead to sand mixing with mud and impurities), be on duty at the weighing station, check the concrete truck&#8217;s lead seal, concrete delivery ticket, cast experimental compression samples, and check the concrete slump.<\/li>\n\n\n\n<li>\u5728\u6df7\u51dd\u571f\u6d47\u7b51\u8fc7\u7a0b\u4e2d<br>. Trong qu\u00e1 tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng,<br>. During the concrete pouring process,<\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list has-medium-font-size\">\n<li class=\"has-medium-font-size\">\u6d47\u7b51\u7b2c\u4e00\u5c42\u6df7\u51dd\u571f\u524d\uff0c\u5e94\u5728\u67f1\u5e95\u94fa\u8bbe\u4e00\u5c42\u9ad8\u6807\u53f7\u6c34\u6ce5\u7802\u6d46\uff08\u539a\u7ea61-2cm\uff09<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Tr\u01b0\u1edbc khi \u0111\u1ed5 l\u1edbp b\u00ea t\u00f4ng \u0111\u1ea7u ti\u00ean, n\u00ean l\u00f3t m\u1ed9t l\u1edbp v\u1eefa xi m\u0103ng &#8211; c\u00e1t m\u00e1c cao (d\u00e0y kho\u1ea3ng 1-2cm) d\u01b0\u1edbi \u0111\u00e1y c\u1ed9t.<\/li>\n\n\n\n<li>Before pouring the first layer of concrete, a layer of high-strength cement-sand mortar (about 1-2cm thick) should be laid at the column base.<\/li>\n\n\n\n<li>\u5b89\u6392\u4eba\u5458\u5728\u4e0b\u65b9\u68c0\u67e5\u67f1\u6a21\u677f\u3001\u652f\u6491\uff0c\u7528\u9524\u5b50\u6572\u51fb\u67f1\u6a21\u677f\u4fa7\u9762<\/li>\n\n\n\n<li>b\u1ed1 tr\u00ed ng\u01b0\u1eddi b\u00ean d\u01b0\u1edbi tr\u1ef1c ki\u1ec3m tra v\u00e1n khu\u00f4n c\u1ed9t, g\u00f4ng ch\u1ed1ng, d\u00f9ng b\u00faa g\u00f5 th\u00e0nh v\u00e1n khu\u00f4n c\u1ed9t,<\/li>\n\n\n\n<li>Arrange personnel below to monitor and check the column formwork, bracing\/waler, and tap the side of the column formwork with a hammer.<\/li>\n\n\n\n<li>\u68c0\u67e5\u76d1\u7763\u632f\u6363\u5de5\u4f5c\uff0c\u5bf9\u4e8e\u9ad8\u67f1\u3001\u5927\u5c3a\u5bf8\u67f1\u9700\u52062-3\u6b21\u6d47\u7b51\uff0c\u6d47\u7b51\u4e00\u90e8\u5206\u8be5\u67f1\u540e\u7acb\u5373\u8f6c\u5411\u53e6\u4e00\u6839\u67f1\uff0c\u4e24\u6b21\u6d47\u7b51\u7684\u95f4\u9694\u65f6\u95f4\u4e0d\u5c11\u4e8e30\u5206\u949f\u4e14\u4e0d\u8d85\u8fc760\u5206\u949f\uff0c\u907f\u514d\u4e00\u6b21\u6027\u6d47\u7b51\u4ea7\u751f\u5de8\u5927\u5e94\u529b\u5bfc\u81f4\u67f1\u6a21\u677f\u7206\u6a21\uff0c\u4e5f\u4e0d\u53ef\u8fc7\u4e45\u5bfc\u81f4\u5f62\u6210\u51b7\u7f1d\uff0c\u6d47\u7b51\u7b2c\u4e8c\u5c42\u65f6\u9700\u786e\u4fdd\u632f\u6363\u68d2\u63d2\u5165\u7b2c\u4e00\u5c42\u7ea610-15cm\uff0c\u4ee5\u5f62\u6210\u4e24\u5c42\u6df7\u51dd\u571f\u4e4b\u95f4\u7684\u8fde\u63a5<\/li>\n\n\n\n<li>ki\u1ec3m tra gi\u00e1m s\u00e1t c\u00f4ng t\u00e1c \u0111\u1ea7m, \u0111\u1ed1i v\u1edbi c\u1ed9t cao, k\u00edch th\u01b0\u1edbc l\u1edbn c\u1ea7n ph\u00e2n l\u00e0m 2-3 l\u1ea7n \u0111\u1ed5, \u0111\u1ed5 m\u1ed9t ph\u1ea7n c\u1ed9t n\u00e0y li\u1ec1n chuy\u1ec3n sang c\u1ed9t kh\u00e1c, th\u1eddi gian ch\u1edd gi\u1eefa 2 \u0111\u1ee3t \u0111\u1ed5 kh\u00f4ng s\u1edbm h\u01a1n 30p v\u00e0 kh\u00f4ng l\u00e2u qu\u00e1 60p, tr\u00e1nh \u0111\u1ed5 m\u1ed9t l\u1ea7n g\u00e2y \u1ee9ng su\u1ea5t l\u1edbn l\u00e0m b\u1ee5c b\u00ea t\u00f4ng v\u00e1n khu\u00f4n c\u1ed9t, c\u0169ng nh\u01b0 kh\u00f4ng ch\u1edd qu\u00e1 l\u00e2u \u0111\u1ec3 d\u1eabn \u0111\u1ebfn h\u00ecnh th\u00e0nh m\u1ed1i n\u1ed1i l\u1ea1nh, khi \u0111\u1ed5 l\u1edbp 2 c\u1ea7n \u0111\u1ea3m b\u1ea3o m\u0169i \u0111\u1ea7m \u0111i xu\u1ed1ng l\u1edbp 1 kho\u1ea3ng 10-15cm, \u0111\u1ec3 t\u1ea1o li\u00ean k\u1ebft gi\u1eefa 2 \u0111\u1ee3t \u0111\u1ed5 b\u00ea t\u00f4ng.<\/li>\n\n\n\n<li>Inspect and supervise the vibrating work. For tall or large-sized columns, pouring needs to be divided into 2-3 lifts\/times. Pour a portion of one column and immediately move to another. The waiting time between two pours should be no less than 30 minutes and no more than 60 minutes, to avoid large stresses from a single pour that could cause formwork failure, and also not too long to form a cold joint. When pouring the second lift, ensure the vibrator tip penetrates the first lift by about 10-15cm to form a connection between the two concrete lifts.<\/li>\n<\/ul>\n\n\n\n<ol class=\"wp-block-list has-medium-font-size\">\n<li>\u62c6\u9664\u67f1\u6a21\u677f\uff0c\u6d47\u6c34\uff0c\u7528\u5851\u6599\u8584\u819c\u5305\u88f9\u517b\u62a4\u67f1\u4f53\u6df7\u51dd\u571f<br>. Th\u00e1o v\u00e1n khu\u00f4n c\u1ed9t, t\u01b0\u1edbi n\u01b0\u1edbc, cu\u1ed1n nilong b\u1ea3o d\u01b0\u1ee1ng b\u00ea t\u00f4ng c\u1ed9t,<br>. Remove the column formwork, water\/cure, and wrap the column concrete with plastic sheeting for curing.<\/li>\n\n\n\n<li>\u517b\u62a4\u671f\u7ed3\u675f\u540e\uff0c\u62c6\u9664\u5305\u88f9\u67f1\u4f53\u7684\u5851\u6599\u8584\u819c\uff0c\u68c0\u67e5\u7ae3\u5de5\u67f1\u4f4d\u3001\u67f1\u5782\u76f4\u5ea6\uff0c\u7528\u56de\u5f39\u4eea\u68c0\u6d4b\u6df7\u51dd\u571f\u5f3a\u5ea6\uff0c\u8fdb\u884c\u8bd5\u5757\u6297\u538b\u8bd5\u9a8c<br>. H\u1ebft th\u1eddi gian b\u1ea3o d\u01b0\u1ee1ng, th\u00e1o nilong b\u1ecdc c\u1ed9t, ki\u1ec3m tra ho\u00e0n c\u00f4ng v\u1ecb tr\u00ed c\u1ed9t, \u0111\u1ed9 th\u1eb3ng c\u1ed9t, ki\u1ec3m tra c\u01b0\u1eddng \u0111\u1ed9 b\u00ea t\u00f4ng b\u1eb1ng s\u00fang b\u1eadt n\u1ea9y, n\u00e9n m\u1eabu th\u00ed nghi\u1ec7m.<br>. After the curing period, remove the plastic sheeting wrapped around the column, check the as-built column position and verticality, test the concrete strength with a rebound hammer, and conduct compression tests on samples.<\/li>\n\n\n\n<li>\u82e5\u6709\u6df7\u51dd\u571f\u67f1\u7f3a\u9677\uff0c\u4f7f\u7528\u4e13\u7528\u7802\u6d46\u6750\u6599\u8fdb\u884c\u5904\u7406\uff0c\u5207\u9664\u7a7f\u5899\u7ba1\u3001\u94a2\u62c9\u6746\uff0c\u5728\u67f1\u4e0a\u5f39\u51fa1\u7c73\u6807\u9ad8\u7ebf\uff0c\u6e05\u7406\u73b0\u573a\uff0c\u79fb\u4ea4\u7ed9\u540e\u7eed\u5de5\u5e8f<br>. X\u1eed l\u00fd khuy\u1ebft t\u1eadt b\u00ea t\u00f4ng c\u1ed9t n\u1ebfu c\u00f3 b\u1eb1ng v\u1eadt li\u1ec7u v\u1eefa chuy\u00ean d\u1ee5ng, c\u1eaft b\u1ecf \u1ed1ng nh\u1ef1a lu\u1ed3n ty, ty th\u00e9p, b\u1eadt m\u1ef1c cos 1m l\u00ean c\u1ed9t, , v\u1ec7 sinh m\u1eb7t b\u1eb1ng, b\u00e0n giao cho c\u00e1c c\u00f4ng t\u00e1c ti\u1ebfp theo.<br>. If there are concrete column defects, use specialized mortar material for repair, cut off the embedded pipes (sleeves for tie rods) and steel tie rods, mark the 1-meter elevation line on the column, clean the site, and hand over to subsequent processes.<\/li>\n<\/ol>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>III. \u6881\u677f\u6df7\u51dd\u571f\u6d47\u7b51\u6d41\u7a0b<\/strong><br><strong>III. Quy tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng d\u1ea7m s\u00e0n<\/strong><br><strong>III. Beam and Slab Concrete Pouring Procedure<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list has-medium-font-size\">\n<li>\u5236\u5b9a\u6df7\u51dd\u571f\u8ba1\u5212\u3001\u6df7\u51dd\u571f\u6cf5\u9001\u8ba1\u5212<br>. Vi\u1ebft k\u1ebf ho\u1ea1ch b\u00ea t\u00f4ng, b\u01a1m b\u00ea t\u00f4ng.<br>. Prepare the concrete plan and concrete pumping plan.<\/li>\n\n\n\n<li>\u6df7\u51dd\u571f\u5355\u4f4d\u5230\u573a\u68c0\u67e5\u6cf5\u8f66\u51fa\u811a\u4f4d\u7f6e\u3001\u7ad9\u7acb\u4f4d\u7f6e<br>. \u0110\u01a1n v\u1ecb b\u00ea t\u00f4ng \u0111\u1ebfn c\u00f4ng tr\u01b0\u1eddng ki\u1ec3m tra v\u1ecb tr\u00ed ra ch\u00e2n b\u01a1m, \u0111\u1ee9ng b\u01a1m.<br>. The concrete unit arrives at the site to check the pump truck&#8217;s outrigger position and standing position.<\/li>\n\n\n\n<li>\u6df7\u51dd\u571f\u6d47\u7b51\u524d\u68c0\u67e5\u9a8c\u6536\u57ab\u5c42\u6807\u9ad8\u3001\u697c\u677f\u6a21\u677f\uff0c\u964d\u677f\u4f4d\u7f6e\u3001\u6807\u9ad8\u3001\u4f38\u7f29\u7f1dV\u578b\u94a2\u7684\u5e73\u76f4\u5ea6\uff0c\u9884\u57cb\u4ef6\uff0c\u8fb9\u6881\u6a21\u677f\u8fb9\u7f18\u7684\u5e73\u76f4\u5ea6\uff0c\u906e\u76d6\u67f1\u94a2\u7b4b\uff0c\u56fa\u5b9a\u67f1\u7b8d\u7b4b\uff0c\u67f1\u94a2\u7b4b\u4f4d\u7f6e\u2026<br>. Ki\u1ec3m tra nghi\u1ec7m thu cos cao \u0111\u1ed9 l\u00f3t n\u1ec1n, v\u00e1n khu\u00f4n s\u00e0n tr\u01b0\u1edbc khi \u0111\u1ed5 b\u00ea t\u00f4ng, v\u1ecb tr\u00ed h\u1ea1 cos, cao \u0111\u1ed9, \u0111\u1ed9 th\u1eb3ng V th\u00e9p khe l\u00fan, c\u00e1c chi ti\u1ebft ch\u00f4n s\u1eb5n, \u0111\u1ed9 th\u1eb3ng m\u00e9p v\u00e1n khu\u00f4n d\u1ea7m bi\u00ean, che ch\u1eafn th\u00e9p c\u1ed9t, c\u1ed1 \u0111\u1ecbnh th\u00e9p \u0111ai c\u1ed9t, v\u1ecb tr\u00ed th\u00e9p c\u1ed9t\u2026.<br>. Inspect and accept the blinding level (base elevation), slab formwork, lowered slab position, elevation, straightness of the V-shaped steel in expansion joints, embedded items, straightness of the edge of the edge beam formwork, cover\/protect column reinforcement, secure column stirrups, column steel position, etc., before pouring concrete.<\/li>\n\n\n\n<li>\u51c6\u5907\u6d47\u7b51\u6df7\u51dd\u571f\uff0c\u6d47\u7b51\u524d\u68c0\u67e5\u9a8c\u6536\u5404\u9879\u51c6\u5907\u5de5\u4f5c\uff0c\u5982\u632f\u6363\u3001\u62b9\u5e73\u5de5\u5177\uff0c\u5de5\u4eba\uff0c\u6c34\u7535\uff0c\u517b\u62a4\u6c34\u7ba1\uff0c\u91d1\u521a\u7802\uff0c\u96e8\u5929\u906e\u76d6\u7528\u7684\u5851\u6599\u5e03\u2026<br>. Chu\u1ea9n b\u1ecb \u0111\u1ed5 b\u00ea t\u00f4ng, ki\u1ec3m tra nghi\u1ec7m thu c\u00e1c c\u00f4ng t\u00e1c chu\u1ea9n b\u1ecb tr\u01b0\u1edbc khi \u0111\u1ed5 b\u00ea t\u00f4ng nh\u01b0, d\u1ee5ng c\u1ee5 \u0111\u1ea7m, \u0111\u00e1nh m\u1eb7t, c\u00f4ng nh\u00e2n, \u0111i\u1ec7n n\u01b0\u1edbc, v\u00f2i b\u1ea3o d\u01b0\u1ee1ng, b\u1ed9t t\u0103ng sika t\u0103ng c\u1ee9ng, nilong che m\u1eb7t khi tr\u1eddi m\u01b0a\u2026.<br>. Prepare to pour concrete, inspect and accept all preparations before pouring concrete, such as vibrating and finishing tools, workers, power and water supply, curing water hoses, concrete hardener (like Sikadur\/Sika hardener powder), plastic sheeting for rain cover, etc.<\/li>\n\n\n\n<li>\u5b89\u6392\u4eba\u5458\u5728\u6405\u62cc\u7ad9\u76d1\u7763\u68c0\u67e5\u6405\u62cc\u7ad9\u3001\u5730\u78c5\uff0c\u68c0\u67e5\u6df7\u51dd\u571f\u8fd0\u8f93\u8f66\u94c5\u5c01\u3001\u6df7\u51dd\u571f\u7968\u636e\uff0c\u5236\u4f5c\u6297\u538b\u8bd5\u5757\uff0c\u68c0\u67e5\u6df7\u51dd\u571f\u574d\u843d\u5ea6<br>. B\u1ed1 tr\u00ed ng\u01b0\u1eddi tr\u1ef1c tr\u1ea1m tr\u1ed9n ki\u1ec3m tra tr\u1ea1m tr\u1ed9n, tr\u1ef1c tr\u1ea1m c\u00e2n, ki\u1ec3m tra k\u1eb9p ch\u00ec xe b\u00ea t\u00f4ng, phi\u1ebfu b\u00ea t\u00f4ng, \u0111\u00fac m\u1eabu n\u00e9n th\u00ed nghi\u1ec7m, ki\u1ec3m tra \u0111\u1ed9 s\u1ee5t b\u00ea t\u00f4ng.<br>. Arrange personnel to be on duty at the batching plant to supervise and check the plant and weighbridge, check the concrete truck&#8217;s lead seal, concrete delivery ticket, make compression test specimens, and check the concrete slump.<\/li>\n\n\n\n<li>\u5728\u6df7\u51dd\u571f\u6d47\u7b51\u8fc7\u7a0b\u4e2d\uff0c\u68c0\u67e5\u6807\u9ad8\u3001\u5e73\u6574\u5ea6\uff0c\u68c0\u67e5\u76d1\u7763\u632f\u6363\u5de5\u4f5c\uff0c\u5148\u6d47\u7b51\u67f1\u3001\u6881\uff0c\u540e\u6d47\u7b51\u677f\uff0c\u5747\u5300\u6d47\u7b51\uff0c\u907f\u514d\u5c40\u90e8\u5e94\u529b\uff0c\u62b9\u5e73\u3001\u517b\u62a4\uff0c\u5b8c\u6210\u6df7\u51dd\u571f\u6d47\u7b51\u540e\u9a8c\u6536\uff0c\u5b8c\u6210\u62b9\u5e73\u540e\u9a8c\u6536<br>. Trong qu\u00e1 tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng, ki\u1ec3m tra cos cao \u0111\u1ed9, \u0111\u1ed9 ph\u1eb3ng, ki\u1ec3m tra gi\u00e1m s\u00e1t c\u00f4ng t\u00e1c \u0111\u1ea7m, \u0111\u1ed5 c\u1ed9t \u0111\u1ed5 d\u1ea7m tr\u01b0\u1edbc, \u0111\u1ed5 s\u00e0n sau, \u0111\u1ed5 san \u0111\u1ec1u tr\u00e1nh \u1ee9ng su\u1ea5t c\u1ee5c b\u1ed9, \u0111\u00e1nh m\u1eb7t, b\u1ea3o d\u01b0\u1ee1ng, nghi\u1ec7m thu sau khi ho\u00e0n th\u00e0nh \u0111\u1ed5 b\u00ea t\u00f4ng, nghi\u1ec7m thu sau khi ho\u00e0n th\u00e0nh \u0111\u00e1nh m\u1eb7t,<br>. During the concrete pouring process, check the elevation and flatness, inspect and supervise the vibrating work, pour columns and beams first, then the slab, pour uniformly to avoid local stress, finish\/trowel, cure, accept after the concrete pouring is completed, and accept after the finishing is completed.<\/li>\n\n\n\n<li>\u6df7\u51dd\u571f\u6d47\u7b51\u540e\uff0c\u68c0\u67e5\u5b9e\u9645\u65b9\u91cf\u4e0e\u56fe\u7eb8\u8ba1\u7b97\u65b9\u91cf\u7684\u5bf9\u6bd4\uff0c\u4ee5\u4fbf\u53ca\u65f6\u53d1\u73b0\u6df7\u51dd\u571f\u4e8f\u65b9\uff0c\u5728\u697c\u677f\u6df7\u51dd\u571f\u8868\u9762\u5f39\u51fa\u8f74\u7ebf\uff0c\u79fb\u4ea4\u8f74\u7ebf\uff0c\u68c0\u67e5\u7ae3\u5de5\u6807\u9ad8\u3001\u697c\u677f\u5e73\u6574\u5ea6\uff0c\u603b\u7ed3\u7ecf\u9a8c\uff0c\u8986\u76d6\u5851\u6599\u8584\u819c\u517b\u62a4\uff0c\u6d47\u6c34\u517b\u62a4<br>. Sau khi \u0111\u1ed5 b\u00ea t\u00f4ng, ki\u1ec3m tra so s\u00e1nh kh\u1ed1i l\u01b0\u1ee3ng th\u1ef1c t\u1ebf so v\u1edbi kh\u1ed1i l\u01b0\u1ee3ng t\u00ednh to\u00e1n tr\u00ean b\u1ea3n v\u1ebd \u0111\u1ec3 k\u00edp th\u1eddi ph\u00e1t hi\u1ec7n b\u00ea t\u00f4ng b\u1ecb \u00e2m kh\u1ed1i, B\u1eadt m\u1ef1c tim tr\u1ee5c n\u00ean m\u1eb7t b\u00ea t\u00f4ng s\u00e0n, b\u00e0n giao tim tr\u1ee5c, ki\u1ec3m tra ho\u00e0n c\u00f4ng cao \u0111\u1ed9, \u0111\u1ed9 ph\u1eb3ng s\u00e0n \u0111\u00fac r\u00fat kinh nghi\u1ec7m, Che nilong b\u1ea3o d\u01b0\u1ee1ng, t\u01b0\u1edbi n\u01b0\u1edbi b\u1ea3o d\u01b0\u1ee1ng,<br>. After pouring concrete, check and compare the actual volume with the volume calculated on the drawing to promptly detect concrete shortages, mark the axis lines on the surface of the slab concrete, hand over the axis lines, check the as-built elevation and slab flatness, summarize lessons learned, cover with plastic sheeting for curing, and water for curing.<\/li>\n\n\n\n<li>\u62c6\u9664\u6881\u677f\u6df7\u51dd\u571f\u6a21\u677f\uff0c\u68c0\u67e5\u7ae3\u5de5\u8fb9\u6881\u5e73\u6574\u5ea6\u3001\u8fb9\u6881\u5e73\u76f4\u5ea6\u3001\u6881\u8fb9\uff0c\u68c0\u67e5\u67f1\u4f4d\uff0c\u7528\u56de\u5f39\u4eea\u68c0\u6d4b\u6df7\u51dd\u571f\u5f3a\u5ea6\uff0c\u82e5\u6000\u7591\u8d28\u91cf\u5219\u8fdb\u884c\u94bb\u82af\u53d6\u6837\uff0c\u8fdb\u884c\u8bd5\u5757\u6297\u538b\u8bd5\u9a8c<br>. Th\u00e1o v\u00e1n khu\u00f4n b\u00ea t\u00f4ng d\u1ea7m s\u00e0n, ki\u1ec3m tra ho\u00e0n c\u00f4ng \u0111\u1ed9 ph\u1eb3ng d\u1ea7m bi\u00ean, \u0111\u1ed9 th\u1eb3ng d\u1ea7m bi\u00ean, m\u00e9p d\u1ea7m, ki\u1ec3m tra v\u1ecb tr\u00ed c\u1ed9t, ki\u1ec3m tra c\u01b0\u1eddng \u0111\u1ed9 b\u00ea t\u00f4ng b\u1eb1ng s\u00fang b\u1eadt n\u1ea9y, khoan r\u00fat l\u00f5i khi nghi ngh\u1edd ch\u1ea5t l\u01b0\u1ee3ng, n\u00e9n m\u1eabu th\u00ed nghi\u1ec7m.<br>. Remove the beam and slab concrete formwork, check the as-built flatness of the edge beam, straightness of the edge beam, beam edge, check the column position, test the concrete strength with a rebound hammer, perform core drilling if quality is suspected, and conduct compression tests on samples.<\/li>\n\n\n\n<li>\u82e5\u6709\u6df7\u51dd\u571f\u3001\u67f1\u6881\u677f\u7f3a\u9677\uff0c\u4f7f\u7528\u4e13\u7528\u7802\u6d46\u6750\u6599\u8fdb\u884c\u5904\u7406\uff0c\u5207\u9664\u7a7f\u5899\u7ba1\u3001\u94a2\u62c9\u6746\uff0c\u6e05\u7406\u73b0\u573a\uff0c\u79fb\u4ea4\u7ed9\u540e\u7eed\u5de5\u5e8f<br>. X\u1eed l\u00fd khuy\u1ebft t\u1eadt b\u00ea t\u00f4ng, c\u1ed9t d\u1ea7m s\u00e0n n\u1ebfu c\u00f3 b\u1eb1ng v\u1eadt li\u1ec7u v\u1eefa chuy\u00ean d\u1ee5ng, c\u1eaft b\u1ecf \u1ed1ng nh\u1ef1a lu\u1ed3n ty, ty th\u00e9p, v\u1ec7 sinh m\u1eb7t b\u1eb1ng, b\u00e0n giao cho c\u00e1c c\u00f4ng t\u00e1c ti\u1ebfp theo.<br>. If there are concrete, column, beam, or slab defects, use specialized mortar material for repair, cut off the embedded pipes (sleeves for tie rods) and steel tie rods, clean the site, and hand over to subsequent processes.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"492\" height=\"369\" src=\"https:\/\/growhome.vn\/wp-content\/uploads\/2025\/11\/image-21.png\" alt=\"\" class=\"wp-image-651\" style=\"width:811px;height:auto\" srcset=\"https:\/\/growhome.vn\/wp-content\/uploads\/2025\/11\/image-21.png 492w, https:\/\/growhome.vn\/wp-content\/uploads\/2025\/11\/image-21-300x225.png 300w, https:\/\/growhome.vn\/wp-content\/uploads\/2025\/11\/image-21-326x245.png 326w, https:\/\/growhome.vn\/wp-content\/uploads\/2025\/11\/image-21-80x60.png 80w\" sizes=\"auto, (max-width: 492px) 100vw, 492px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>I. \u51c6\u5907\u9636\u6bb5I. Giai \u0111o\u1ea1n chu\u1ea9n b\u1ecbI. Preparation Phase II. \u67f1\u4f53\u6df7\u51dd\u571f\u6d47\u7b51\u6d41\u7a0bII. Quy tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng c\u1ed9tII. Column Concrete Pouring Procedure III. \u6881\u677f\u6df7\u51dd\u571f\u6d47\u7b51\u6d41\u7a0bIII. Quy tr\u00ecnh \u0111\u1ed5 b\u00ea t\u00f4ng d\u1ea7m s\u00e0nIII. Beam and Slab Concrete Pouring Procedure<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-647","post","type-post","status-publish","format-standard","hentry","category-bien-phap-thi-cong"],"_links":{"self":[{"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/posts\/647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/growhome.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=647"}],"version-history":[{"count":3,"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/posts\/647\/revisions"}],"predecessor-version":[{"id":652,"href":"https:\/\/growhome.vn\/index.php?rest_route=\/wp\/v2\/posts\/647\/revisions\/652"}],"wp:attachment":[{"href":"https:\/\/growhome.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/growhome.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/growhome.vn\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}